Steel Structure Railway Station-manufacture,factory,supplier from China

(Total 24 Products for Steel Structure Railway Station)
Domestic steel structure stations, including railway stations, bus stations.
  Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
  Contact Now
IntroduceSteel structure platform is a structural platform composed of steel material, which is one of the main types of building structure of the platform.The structure is mainly composed of steel beam, steel column, steel truss and other components made of type steel and steel plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and other rust removal and rust prevention technology.Welds, bolts or rivets are usually used between the members or components.Because of its light weight and simple construction, it is widely used in platform engineering p
  Contact Now
Basic InstructionYu Biying, member of the project team of Beijing University of technology and deputy director of the energy and environmental policy research center of Beijing University of technology, introduced to the media, "We have installed intelligent monitoring equipment at dozens of points such as the grandstand area of the venue, energy consuming equipment and audience entrance to collect human-machine and physical environment data such as carbon dioxide concentration, flow of people, electricity, temperature and humidity of the venue in real time.
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.
  Contact Now
Composition structure    Welding robot mainly includes robot and welding equipment. The robot is composed of the robot body and the control cabinet (hardware and software).        Welding equipment, such as arc welding and spot welding, is composed of welding power supply (including its control system), wire feeder (arc welding), welding gun (clamp), etc.
  Contact Now
Basic InstructionDart is a public transportation system based totally on public transportation. it connects the suburb of dar es salaam with the important agency district. the middle started out out operation in may 2016. the primary phase of manufacturing became finished in december 2015, with a complete price of 159.6 million euros, funded thru the african improvement financial institution, the arena monetary organization and the tanzanian authorities.
  Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
  Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionYu biying, member of the mission team of beijing college of technology and deputy director of the energy and environmental policy studies center of beijing college of technology, added to the media, "we've got established intelligent monitoring device at dozens of points consisting of the grandstand region of the venue, power eating system and target audience front to acquire human-gadget and physical environment data consisting of carbon dioxide attention, waft of human beings, electricity, temperature and humidity of the venue in actual time.
  Contact Now
IntroduceMetallic shape platform is a structural platform composed of metal cloth, that's one of the number one forms of building structure of the platform.the form is especially composed of steel beam, metallic column, metallic truss and one-of-a-kind additives made from type steel and metal plate, and adopts silanization, natural manganese phosphorization, washing and drying, galvanizing and one-of-a-kind rust removal and rust prevention era.welds, bolts or rivets are typically used among the people or additives.due to its mild weight and easy creation, it's miles widely used in plat
  Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,forty-four meters of it had been blown up throughout the preventing.
  Contact Now
IntroduceMetallic structure platform is a structural platform composed of metal material, which is one of the primary types of building structure of the platform.the shape is especially composed of steel beam, metal column, metallic truss and different additives fabricated from type steel and metal plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and different rust elimination and rust prevention generation.welds, bolts or rivets are commonly used between the individuals or additives.because of its mild weight and simple construction, it's mil
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
Steel structure bridge is a form of bridge, refers to a bridge top knot important load bearing capacity part is made of stainless steel profiles. The steel structure bridge is the same as the bridge, which is above the height of rivers, lakes and sea bottom cut barriers. The middle long-span bridge is more likely to see prestressed steel concrete bridge and steel structure bridge. The structure of a steel structure bridge consists of a main bridge along its longitudinal direction.
  Contact Now
Basic InstructionRonald lwakatare, chief executive of Tanzania's rapid transit authority, said they had received $148.1 million for phase III and $99.9 million for phase IV. "The funds obtained will contribute to the actual construction of BRT infrastructure, and the government will be responsible for compensating people who will be affected by the project," he said.
  Contact Now
The picture is the steel structure bridge components produced in our factory.
  Contact Now
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
  Contact Now
In simple terms, steel structure is actually a kind of structure composed of different steel materials through a certain connection. Mixing different types of materials can effectively improve the overall performance of steel structure. With the continuous progress of science and technology, steel structure has been widely used in engineering projects, so as to effectively display its performance advantages. For example, high-rise buildings make full use of the characteristics of strong steel structure to effectively improve the quality of construction engineering.
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
Basic InstructionWe have a sound system of qualifications, the existing steel structure engineering contracting qualification (Level I), steel structure manufacturing and installation qualification (Level I), light steel structure engineering design qualification (Grade A), mechanical and electrical construction general contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in total with 20 qualifications.Steel construction projectAustralia steel bridgeTanzania steel bridge
  Contact Now
Basic InstructionThe bridge has a total duration of 111 meters and a span of 5 meters,40-4 meters of it have been blown up for the duration of the combating.
  Contact Now
Relate News
A few days ago, the steel beam hoisting construction of Bandri railway overpass bridge was completed for the bid section 1 project of phase II BRT project in Tashi, Tanzania.The upper part of the overpass is composed of steel structure I-beams and reinforced concrete bridge deck, which are spliced by 126 I-steel beams, with a total length of 80m.
For the steel frame shape, with the growth of the wide variety of layers and height and bearing a large vertical load, the lateral resistance (wind load, earthquake movement, and so forth.) requirements turn out to be the primary bearing traits of the body.The steel frame shape device is typically divided into frame structure, frame bracing structure, body shear wall structure, and body tube structure.Frame shape: the frame contains columns and beams bearing vertical and lateral forces.
On August 18, 2022, the high-quality development summit forum of the steel structure industry in the Yellow River Basin was successfully held in Jinan under the guidance of the housing and Urban Rural Development Department of Shandong Province, sponsored by the steel structure industry association of Shandong Province, and organized by Shandong Guoshun Construction Group Co., Ltd. and Guoshun Lvjian Technology Co., Ltd.
      The reconstruction project of national fitness center in Changqing district undertaken by Guoshun Group was selected as gold medal project of Steel structure in Shandong Province by Shandong Steel Structure Industry Association.       The National Fitness Center project in Changqing District is a key project in Changqing District. With a total investment of 140 million yuan, the project covers an area of 38197.1 square meters and a total construction area of 26188.85 square meters, including 21772.21 square meters of newly built construction area.
Recently, more than 400 tons of steel structure products produced and processed by Guoshun Group's smart factory passed the inspection and were loaded and shipped to New Zealand. On October, Guoshun Group's export volume has exceeded 100 containers. It is reported that the steel structure products shipped this time will be used in the construction of the "Ferry Terminal in Wellington and Picton, New Zealand".
These days there are warmness exchangers made of different substances. the choice of the suitable cloth is decisive for the function and carrier lifestyles. because of this, unique attention must be paid to it from the begin. viesel has been constructing heat exchangers only out of stainless-steel for over 50 years.excessive needs are made at the fabric in heat exchanger creation. warmth stresses because of the massive temperature differences can create cracks inside the fabric.
Browns Plains Bus StationPROJECT SCOPEThis project located in Australia Browns Plains and adjoining the Grand Plaza shopping aimed to:Provide more passenger waiting space.Provide new fully sheltered platforms with comfortable seating, security cameras and lighting.Improve pedestrian and cyclist connectivity between the bus station, the shopping centre and Browns Plains Road.Improve accessibility for all customers and ensure compliance with disability access standards.Introduce a designated kiss 'n' ride area to drop-off and pick-up passengers.Introduce bicycle storage facilities.A part
Aeronautics – aircrafts won’t be whole with out its structural metal additives.Car – automobile producers also count metallic as an important material.Creation – the best call for for structural steel comes from the development industry.
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.