Heat exchanger-manufacture,factory,supplier from China

(Total 24 Products for Heat exchanger)
IntroducePlate heat exchanger has the characteristics of high heat exchange efficiency, small heat loss, compact and lightweight structure, small floor area, wide application and long service life.
  Contact Now
Stainless steel heat exchanger is a kind of heat exchanger made of stainless steel. It has very good oxidation resistance, safety and health, and is widely used in food, medicine, heating, domestic water, air conditioning return water and other fields. According to the data of the heat exchange equipment promotion center, the stainless steel heat exchanger has better heat transfer effect and longer service life than the traditional carbon steel heat exchanger.Stainless steel heat exchanger has been widely used in many fields at present.
  Contact Now
IntroducePlate warmness exchanger has the characteristics of excessive warmness trade overall performance, small heat loss, compact and mild-weight shape, small ground place, extensive software program and lengthy carrier life.
  Contact Now
IntroducePlate heat exchanger has the characteristics of excessive warmness change performance, small heat loss, compact and light-weight shape, small ground vicinity, wide software and lengthy service lifestyles.
  Contact Now
IntroducePlate heat exchanger has the characteristics of excessive warm temperature alternate ordinary performance, small warmth loss, compact and light-weight shape, small ground region, massive software and extended provider life.
  Contact Now
IntroducePlate warmness exchanger has the characteristics of excessive warmth change overall performance, small warmth loss, compact and light-weight form, small floor vicinity, huge software and prolonged service lifestyles.
  Contact Now
Falling film evaporation is to add the feed liquid from the upper tube box of the heating chamber of the falling film evaporator, evenly distribute it to each heat exchange tube through the liquid distribution and film-forming device, and form a uniform film to flow from top to bottom under the action of gravity, vacuum induction and air flow. During the flow process, it is heated and vaporized by the shell side heating medium. The generated steam and liquid phase enter the separation chamber of the evaporator together.
  Contact Now
IntroduceMetallic shape platform is a structural platform composed of metal cloth, that's one of the number one forms of building structure of the platform.the form is especially composed of steel beam, metallic column, metallic truss and one-of-a-kind additives made from type steel and metal plate, and adopts silanization, natural manganese phosphorization, washing and drying, galvanizing and one-of-a-kind rust removal and rust prevention era.welds, bolts or rivets are typically used among the people or additives.due to its mild weight and easy creation, it's miles widely used in plat
  Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!
  Contact Now
InstructionFlue gasoline desulfurization and denitration technology is a boiler flue fuel purification technology carried out to the chemical industry of multi nitrogen oxide and sulfur oxide generation. nitrogen oxides and sulfur oxides are one of the principal assets of air pollutants. consequently, the application of this era has many advantages for ambient air purification.
  Contact Now
The high content of molybdenum, chromium and nitrogen make unss31254 have excellent resistance to pitting corrosion and crevice corrosion. The addition of copper improves the corrosion resistance in some acids. In addition, unss31254 has good stress corrosion cracking resistance due to its high nickel content and high chromium and molybdenum content.S31254 is an alloy material with corrosion resistance. Its density is 8.0g/cm3 and its melting point is 1320-1390 ℃. The carbon content of unss31254 is very low, which means that the risk of carbide precipitation due to heating is very small.
  Contact Now
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionDart is a public transportation gadget primarily based on public transportation. it connects the suburb of dar es salaam with the critical enterprise district. the center started out operation in may 2016. the primary section of production turned into completed in december 2015, with a complete price of 159.6 million euros, funded via the african improvement bank, the arena financial institution and the tanzanian authorities.
  Contact Now
Basic InstructionWe have a legitimate system of qualifications, the prevailing steel form engineering contracting qualification (Level I), steel form manufacturing and installation qualification (Level I), moderate steel form engineering format qualification (Grade A), mechanical and electric powered introduction widespread contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in trendy with 20 qualifications.Steel construction projectSteel projects in China
  Contact Now
Basic InstructionWe have a valid gadget of qualifications, the present metallic shape engineering contracting qualification (Level I), metallic shape production and set up qualification (Level I), mild metallic shape engineering layout qualification (Grade A), mechanical and electric creation wellknown contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in general with 20 qualifications.Steel construction projectTanzania steel bridgeSteel projects in China
  Contact Now
Basic InstructionOur inexperienced assembled metallic shape era device makes use of progressed node connection era. We completely don't forget the necessities of residential capabilities and smooth ornament on this confined area of the house, and there's now not the conventional metallic shape and a few concrete shape of the convex beam phenomenon.
  Contact Now
Light weight: the strength of steel is higher, flexibility is also high, compared with the traditional reinforced concrete building, its high strength, light weight, all rigid frame rigidity, forming ability is strong.
  Contact Now
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
  Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.
  Contact Now
Basic InstructionThe bridge has a total duration of 111 meters and a span of five meters,forty-4 meters of it had been blown up all through the preventing.
  Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,40-4 meters of it were blown up at some point of the preventing.
  Contact Now
Basic InstructionDart is a public transportation system based totally on public transportation. it connects the suburb of dar es salaam with the important agency district. the middle started out out operation in may 2016. the primary phase of manufacturing became finished in december 2015, with a complete price of 159.6 million euros, funded thru the african improvement financial institution, the arena monetary organization and the tanzanian authorities.
  Contact Now
Relate News
These days there are warmness exchangers made of different substances. the choice of the suitable cloth is decisive for the function and carrier lifestyles. because of this, unique attention must be paid to it from the begin. viesel has been constructing heat exchangers only out of stainless-steel for over 50 years.excessive needs are made at the fabric in heat exchanger creation. warmth stresses because of the massive temperature differences can create cracks inside the fabric.
In order to thoroughly implement the strategy of strengthening the city through industry, promote the in-depth development of intelligent technological transformation, and accelerate the pace of high-end, intelligent and green technological transformation of enterprises, Jinan Municipal Bureau of industry and Information Technology launched a solicitation activity for "Jinan industrial technological transformation service providers" to the society.
On June 30, 2022, nearly 40 new employees came to the group headquarters to jointly participate in the 2022 youth plan growth training camp of Guoshun group for a period of 10 days.
         The urban expressway Shanhai Road construction project undertaken by Shandong Guoshun Group is the first expressway after the release of Yantai's "12335" policy plan, which is of great significance to improving the quality of urban functions and enhancing the ability of the central city to radiate and drive. The project starts from the Tashan Tunnel in the north and ends at Lvsida Road in the south, with a total length of about 5.624km.
In order to accurately focus on the progress of the construction project of "Guoshun green low carbon demonstration Industrial Park", and scientifically handle the relationship between construction safety and production development.
    In November, the group signed the first phase of the BRT station project in dar es Salaam, Tanzania, which will become another bright spot in the international trade of the Group after its completion.    The group will take this as an opportunity to strengthen foreign exchanges and cooperation, actively docking the international trade market, fully open the domestic and foreign "double good" situation, for the realization of the group "double hundred goals" to create a new trend!
On the afternoon of May 13, 2022, dailongcheng, member of the Standing Committee of the CPC Municipal Committee, director of the publicity department, Secretary of the Education Working Committee of the CPC Municipal Committee, and other leaders visited Guoshun group to carry out research.
Recently, the main construction of kiwar Road Pedestrian Overpass of bid section 1 of Tanzanian BRT phase II project was completed.In order to ensure the smooth construction of the overpass, the project department developed a detailed construction scheme before construction, and conducted pre job training for all construction personnel to strictly control the quality.
  Recently, two rod-arch Bridges in the first phase of the municipal project in Cuizhai South Area of Jinan starting Area have completed the main construction after overall careful planning and careful deployment, laying a foundation for the full opening of municipal roads in this area.   According to the introduction, the first phase of the municipal project in the south area of Cuizhai contains 9 roads, with a total length of 12.457 kilometers, including Cuiqing Road, Cuiqing Branch Road, Trunk Road 1, Jieying Road, North Boundary Road, Hengshi Road, City Exhibition Hall Ring