Fireproof fabricated curtain wall-manufacture,factory,supplier from China

(Total 24 Products for Fireproof fabricated curtain wall)
Curtain wall is the exterior wall enclosure of a building, which does not bear weight and is hung like a curtain, so it is also called "curtain wall". It is a light wall with decorative effect commonly used in modern large and high-rise buildings.
  Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionThe whole process supervision and inspection of the project was completed by the international well-known bureau veritas. The design, production and full assembly services of Guoshun group were evaluated as "very satisfied" by the owner icafal Ingenier í a Y constructi ó n S.A. (the sixth largest general contractor in Chile and rated as the national champion of Chilean construction sustainable development company by the Chilean house of Representatives).Site Display
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionThe complete process supervision and inspection of the assignment changed into completed with the aid of the international well-known bureau veritas. the layout, production and full assembly offerings of guoshun organization had been evaluated as "very glad" by using the owner icafal ingenier í a y constructi ó n s.a. (the 6th largest standard contractor in chile and rated because the countrywide champion of chilean creation sustainable development business enterprise through the chilean residence of representatives).Site Display
  Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
IntroductionSteel bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by British engineer Donald Bailey at the beginning of World War II in 1938. The main design concept is to assemble the fabricated steel bridge with the least kinds of unit components, which can bear various loads and different spans, and only need to be transported by general medium-sized trucks. In special cases, it can be built entirely by manpower
  Contact Now
Basic InstructionAccording to executive director Sun Deshan, the international trade business of Guoshun group has become one of the "troikas" in parallel with the main environmental protection industry of air pollution control and the green fabricated steel structure construction industry. In the international market, it mainly undertakes steel structure engineering projects and flue gas treatment projects, especially steel structure engineering projects.
  Contact Now
    Steel frame bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by the British engineer Donald Bailey at the beginning of the Second World War in 1938. The main design concept is to assemble the assembled steel bridge with the least types of unit members, which can bear various loads and different spans, and only need to be transported by ordinary medium-sized trucks.
  Contact Now
IntroduceMetallic structure platform is a structural platform composed of metal material, which is one of the primary types of building structure of the platform.the shape is especially composed of steel beam, metal column, metallic truss and different additives fabricated from type steel and metal plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and different rust elimination and rust prevention generation.welds, bolts or rivets are commonly used between the individuals or additives.because of its mild weight and simple construction, it's mil
  Contact Now
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Contact Now
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Product application in airport case show
  Contact Now
IntroducePlate warmness exchanger has the characteristics of excessive warmth change overall performance, small warmth loss, compact and light-weight form, small floor vicinity, huge software and prolonged service lifestyles.
  Contact Now
Falling film evaporation is to add the feed liquid from the upper tube box of the heating chamber of the falling film evaporator, evenly distribute it to each heat exchange tube through the liquid distribution and film-forming device, and form a uniform film to flow from top to bottom under the action of gravity, vacuum induction and air flow. During the flow process, it is heated and vaporized by the shell side heating medium. The generated steam and liquid phase enter the separation chamber of the evaporator together.
  Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!
  Contact Now
Assembled steel structure:Assembled steel structure, also known as modular steel structures, offer several advantages in the field of construction. The detailed advantages of Assembled steel structure in buildings are as follows: pre-assembled in a factory-controlled environment, allowing for faster construction.
  Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.          Construction Process
  Contact Now
Basic InstructionThe bridge has a total length of 111 meters and a span of 5 meters,Forty-four meters of it were blown up during the fighting.
  Contact Now
Basic InstructionThe bridge has a total duration of 111 meters and a span of five meters,forty-4 meters of it had been blown up all through the preventing.
  Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,40-4 meters of it were blown up at some point of the preventing.
  Contact Now
Relate News
For the steel frame shape, with the growth of the wide variety of layers and height and bearing a large vertical load, the lateral resistance (wind load, earthquake movement, and so forth.) requirements turn out to be the primary bearing traits of the body.The steel frame shape device is typically divided into frame structure, frame bracing structure, body shear wall structure, and body tube structure.Frame shape: the frame contains columns and beams bearing vertical and lateral forces.
In November 2024, Guoshun Group was awarded the prestigious ACRS 3679.2 certification for steel products, becoming a leading company in the field of welded H-shaped steel and the first Chinese company to achieve this certification.
In 2021, the results of the selection of "2020 World's Best Stadium" initiated by the world-renowned professional stadium data website StadiumDB will be announced. The outstanding performance in terms of value, functionality and innovation was selected by the jury of the expert group of architects and was selected as the 20th place in the "Best Stadium of 2020".
On the afternoon of July 14, Xiao Bangguo, vice president of the metallurgical industry planning and Research Institute, Liu Tao, assistant to the president, Feng fan and Liao Chong visited Shandong Guoshun Construction Group for discussion and research.
Browns Plains Bus StationPROJECT SCOPEThis project located in Australia Browns Plains and adjoining the Grand Plaza shopping aimed to:Provide more passenger waiting space.Provide new fully sheltered platforms with comfortable seating, security cameras and lighting.Improve pedestrian and cyclist connectivity between the bus station, the shopping centre and Browns Plains Road.Improve accessibility for all customers and ensure compliance with disability access standards.Introduce a designated kiss 'n' ride area to drop-off and pick-up passengers.Introduce bicycle storage facilities.A part
         The urban expressway Shanhai Road construction project undertaken by Shandong Guoshun Group is the first expressway after the release of Yantai's "12335" policy plan, which is of great significance to improving the quality of urban functions and enhancing the ability of the central city to radiate and drive. The project starts from the Tashan Tunnel in the north and ends at Lvsida Road in the south, with a total length of about 5.624km.
From August 10 to 12, 2021, representatives of African Development Bank, Tanzania Ministry of Finance, BRT Authority of Tanzania Economic capital And Tanzania Highway Authority, owner of the project, visited the BRT-2 Phase 1 project of Tanzania for a three-day evaluation and inspection. The investigation team inspected the construction of the bridge, asphalt concrete pavement and bus station under construction, and listened to the detailed report of the project leader on the progress of the project and the difficulties faced at present.
The Dubai Expo 2020 has come to a glorious end. As the "finale" of the series of provincial activities of The China Pavilion, the opening ceremony of Shandong Week attracted political and business representatives from many countries, regions and international organizations from all over the world to participate in the event online and offline.