Cheap Prefabricated Steel Structure-manufacture,factory,supplier from China

(Total 24 Products for Cheap Prefabricated Steel Structure)
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
  Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contact Now
Basic InstructionRecently, the provincial Xiaoqing River comprehensive management leading group came to our city to supervise and inspect the comprehensive management of ecological environment in Xiaoqing River Basin. Vice Mayor Wang Xinwen attended the event.Site DisplayConstruction Process
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionOur green assembled steel structure technology system uses improved node connection technology. We fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon.
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Contact Now
Basic InstructionYu biying, member of the mission team of beijing college of technology and deputy director of the energy and environmental policy studies center of beijing college of technology, added to the media, "we've got established intelligent monitoring device at dozens of points consisting of the grandstand region of the venue, power eating system and target audience front to acquire human-gadget and physical environment data consisting of carbon dioxide attention, waft of human beings, electricity, temperature and humidity of the venue in actual time.
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
IntroduceSteel structure platform is a structural platform composed of steel material, which is one of the main types of building structure of the platform.The structure is mainly composed of steel beam, steel column, steel truss and other components made of type steel and steel plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and other rust removal and rust prevention technology.Welds, bolts or rivets are usually used between the members or components.Because of its light weight and simple construction, it is widely used in platform engineering p
  Contact Now
IntroduceMetallic structure platform is a structural platform composed of metal material, which is one of the primary types of building structure of the platform.the shape is especially composed of steel beam, metal column, metallic truss and different additives fabricated from type steel and metal plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and different rust elimination and rust prevention generation.welds, bolts or rivets are commonly used between the individuals or additives.because of its mild weight and simple construction, it's mil
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
Basic InstructionYu Biying, member of the project team of Beijing University of technology and deputy director of the energy and environmental policy research center of Beijing University of technology, introduced to the media, "We have installed intelligent monitoring equipment at dozens of points such as the grandstand area of the venue, energy consuming equipment and audience entrance to collect human-machine and physical environment data such as carbon dioxide concentration, flow of people, electricity, temperature and humidity of the venue in real time.
  Contact Now
Basic InstructionThe bridge has a total duration of 111 meters and a span of 5 meters,40-4 meters of it have been blown up for the duration of the combating.
  Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,forty-four meters of it had been blown up throughout the preventing.
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
Composition structure    Welding robot mainly includes robot and welding equipment. The robot is composed of the robot body and the control cabinet (hardware and software).        Welding equipment, such as arc welding and spot welding, is composed of welding power supply (including its control system), wire feeder (arc welding), welding gun (clamp), etc.
  Contact Now
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionWe fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon. After the optimization and innovation node, the connection method and production process are easy to control the quality of technology.Steel construction projectSteel projects in China
  Contact Now
Relate News
For the steel frame shape, with the growth of the wide variety of layers and height and bearing a large vertical load, the lateral resistance (wind load, earthquake movement, and so forth.) requirements turn out to be the primary bearing traits of the body.The steel frame shape device is typically divided into frame structure, frame bracing structure, body shear wall structure, and body tube structure.Frame shape: the frame contains columns and beams bearing vertical and lateral forces.
      The reconstruction project of national fitness center in Changqing district undertaken by Guoshun Group was selected as gold medal project of Steel structure in Shandong Province by Shandong Steel Structure Industry Association.       The National Fitness Center project in Changqing District is a key project in Changqing District. With a total investment of 140 million yuan, the project covers an area of 38197.1 square meters and a total construction area of 26188.85 square meters, including 21772.21 square meters of newly built construction area.
Recently, more than 400 tons of steel structure products produced and processed by Guoshun Group's smart factory passed the inspection and were loaded and shipped to New Zealand. On October, Guoshun Group's export volume has exceeded 100 containers. It is reported that the steel structure products shipped this time will be used in the construction of the "Ferry Terminal in Wellington and Picton, New Zealand".
On August 18, 2022, the high-quality development summit forum of the steel structure industry in the Yellow River Basin was successfully held in Jinan under the guidance of the housing and Urban Rural Development Department of Shandong Province, sponsored by the steel structure industry association of Shandong Province, and organized by Shandong Guoshun Construction Group Co., Ltd. and Guoshun Lvjian Technology Co., Ltd.
A few days ago, the steel beam hoisting construction of Bandri railway overpass bridge was completed for the bid section 1 project of phase II BRT project in Tashi, Tanzania.The upper part of the overpass is composed of steel structure I-beams and reinforced concrete bridge deck, which are spliced by 126 I-steel beams, with a total length of 80m.
These days there are warmness exchangers made of different substances. the choice of the suitable cloth is decisive for the function and carrier lifestyles. because of this, unique attention must be paid to it from the begin. viesel has been constructing heat exchangers only out of stainless-steel for over 50 years.excessive needs are made at the fabric in heat exchanger creation. warmth stresses because of the massive temperature differences can create cracks inside the fabric.
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.
Aeronautics – aircrafts won’t be whole with out its structural metal additives.Car – automobile producers also count metallic as an important material.Creation – the best call for for structural steel comes from the development industry.
Sheikh Abdullah Al Salem Cultural Centre (ASCC) is a new world-class museum district within Kuwait City. Together with the Sheikh Jaber Al Ahmad Cultural Centre (JACC), and recently restored Al Salam Palace, also SSH projects, it will form Kuwait’s new national cultural district,GuoShun Group supply the Main steel structure,SSH as general contractor.The museums are a celebration of Kuwaiti, Islamic and Arab culture and history.